PILBARA RAILWAY PAGES
BHPBilliton IRON ORE ROAD

Sundowner SIDING
Page started 25/06/2005.
Since the 26th of June, 2005 count have rode on the Sundowner!

Pilbara Black Rock Stakes Special
BHPBilliton took the Sundowner coach out to Goldsworthy Siding for the 35th annual running of the Pilbara Black Rock Stakes wheel barrow race, from Goldsworthy to Port Hedland, which was run on Saturday 25th June, 2005. The Sundowner was stabled at Goldsworthy Siding passing track overnight to assist with the entertainment. Thus preventing crosses or meets at Goldsworthy whilst it was there.
5636 did the honours on Friday by taking it out to Goldsworthy, placing it in the passing track and was suppose to work back light engine. But due to engine problems on a loaded train, it ended up double heading the loaded back to Goldsworthy Junction long hood leading, very rare indeed!
And then on Saturday the 25th of June, 5648 headed out to retrieve the Sundowner, got all the way to Rubin Junction to turn (there is a triangle located there) only to find that Hedland Gang had one leg out of service. So it ended up leading the Sundowner back to Nelson Point Yard long hood leading!

Click on thumbnails for larger image.

This set from Friday 24th June, 2005. The delivery leg.

IMG_3197tn IMG_3202tn IMG_3220tn IMG_3237tn IMG_3249tn IMG_3254tn IMG_3268tn IMG_3297tn IMG_3327tn IMG_3346tn IMG_3348tn IMG_3351tn IMG_3368tn IMG_3371tn

This set from Saturday 25th June, 2005. The return leg.

IMG_3770tn IMG_3781tn IMG_3786tn IMG_3789tn IMG_3799tn IMG_3803tn IMG_3826tn IMG_3832tn IMG_3837tn IMG_3843tn

Alstom Special
BHP ran a Sundowner special to commemorate 25 years of ALSTOM's signal and comms service contract on Friday 12th April, 2002. The train consist was 5634, Sundowner coach, 5653. The Sundowner carried BHP Rail and ALSTOM staff out to the 39 kilometre detector site. This site has Hot Wheel Detection (HWD), Hot Box Detection (HBD), Automatic Equipment Identification (AEI) and Wheel Impact Monitoring (WIM). All this informationn is relayed to repeater 1 located at the 55 kilometre mark (East Turner River), and relayed via radio back to Train Control at Nelson Point, Port Hedland.

Click on thumbnails for larger image.

Sundowner @ GJ Sundowner past GJ Cabin Sundowner approach 39K Sundowner @ 39K Sundowner @ 39K Sundowner @ 39K Sundower Coach No 1 end Sundowner Coach No. 2 end Kick it to me!! Sundowner depart 39K Sundowner thru Bing Sundowner GJ Cabin return

Set Back to Pilbara Yard or BHP Road
All images are © www.pilbararailways.com.au Contact Us

Valid HTML 4.0 Transitional Web Counter